Monday, March 2, 2009

Moving in.

Two stones down.



lining up the holes.

Are round stone.

Lifting the base stone.

Cleaning the holes.


Are Crain.











Monday, February 16, 2009

Concrete

This is after the concrete is fully cured, and we have the patterns for the stones on it.
After we were finished with the pour we had to emty the hose.
Smoothing the concrete.






the concrete truck arives.
we had to seel the concrete mold with a hardening foam.